← RFP feed
FRted

Accord cadre de maîtrise d'oeuvre urbaine pour la réalisation de la ZAC Mont Coco à Caen (14000)

SPL CAEN LA MER AMENAGEMENT, Colombelles · France

See if you are a match for this RFP
Procedure
Framework / panel
Nature
Masterplan
Building type
Civic
Estimated value
€4,000,000
Published
2026-09-24
Deadline
Not stated

Unlock this RFP

Members open the original notice and every tender document, read a plain-language brief and see how well each RFP fits their firm.

  • The original notice and all the tender documents
  • A plain-language brief in your language
  • Your match score on every RFP
  • A workspace to build the team, collect the documents and submit on time
Start your free 5-day trial →No card needed. Partners you invite always join free.

Summary

CPV: Services d'ingénierie Accord cadre mono attributaire à marchés subséquents et à bons de commande sans minimum et avec un maximum de 4 000 000 euros HT. Missions identifiées à ce jour et relevant de marchés subséquents: missions de maîtrise d'oeuvre des espaces publics et des infrastructures (PRO, DCE, VISA, DET, AOR). Missions relevant de bons de commande: appropriation des études existantes, reprise/mise à jour initiale du tableau de programmation et de constructibilité, actualisation du tableau de programmation et de constructibilité par projet, plan de synthèse général des réseaux, bilan besoins électriques et thermiques, réévaluation de l'estimation des travaux, étude de capacité ou faisabilité d'un ilot, fiche de lot, accompagnement projet immobilier en conception, analyse et avis sur dossier PC, suivi projet immobilier en réalisation, plan d'intégration et actualisation du plan par projet, création maquette numérique, perspective.

Documents to submit

The usual items for this kind of tender; the tender documents have the exact list.
  • Team composition and CVsThe people proposed for each role, with CVs in the format asked.
  • Comparable project referencesUsually three to five, with client, value, dates and your role; often on the buyer's form.
  • Methodology and organisation noteHow the team will run the commission: phases, coordination, quality, BIM when asked.
  • Fee proposalOn the buyer's price schedule when there is one; by phase and discipline.
  • Turnover and financial standingAccounts or a bank statement when the tender sets a minimum turnover.
  • European Single Procurement Document: DUME or the DC1/DC2 formsOne per firm in the team, signed by its legal representative.
  • Company registration and proof of professional registrationCommercial register extract; architects' and engineers' registration certificates.
  • Professional indemnity insurance certificateFor each firm, with the cover the tender requires.
  • Team agreement or power of attorneyConsortium agreement, or the mandate naming the lead firm, when bidding as a group.

When you apply, this list becomes the workspace checklist: tick each document off and attach the file.

CPV codes

71300000 · 71313000 · 71240000 · 71400000