← RFP feed
FRted

Allée Verte Paris 11 - Complete project management mission (preliminary study detailed design construction supervision sign-off) and site supervision for refurbishment with occupancy and according to DEET of an industrial building with 23 units and 52 parking spaces

Allée Verte Paris 11 - Mission complète de MOE (DIA AVP PRO ACT DET VISA AOR) et EVA pour la réhabilitation en milieu OCCUPE et selon DEET d'un hôtel industriel de 23 locaux et 52 places de pkg

Régie Immobilière de la Ville de Paris, Paris · France

See if you are a match for this RFP
Procedure
Restricted design commission
Nature
Extension / refurb
Building type
Industrial
Estimated value
€5,800,000
Published
2026-11-12
Deadline
Not stated

Unlock this RFP

Members open the original notice and every tender document, read a plain-language brief and build their bid team in one workspace.

  • The original notice and all the tender documents
  • A plain-language brief in your language
  • A workspace to build the team, collect the documents and submit on time
  • Invite partner firms and guests: they never pay
Create a free account →Free: every tender with your match score, email alerts and your company page. Answering an RFP starts a 7-day free trial.

Summary

CPV: Services d'architecte pour les bâtiments Mission complète de maîtrise d'oeuvre et mission EVA pour la réhabilitation énergétique d'un hôtel industriel de 2 bâtiments occupés et pkgs. Les travaux consisteront principalement en : pose de panneaux photovoltaïques en autoconsommation, ITE, remplacement des menuiseries avec occultations, de la ventilation, de la chaufferie, réfection de l'étanchéité, amélioration du confort d'été, réfection des parties communes avec amélioration de l'éclairage, de l'accessibilité, de la SSI, des sanitaires et l'étude de la possibilité de rendre des locaux en ERP 5ème catégorie .Les travaux visent un gain énergétique minimal de 40% (Cep après travaux 230 000 kWh/m²/an) dans le cadre du Décret Tertiaire. L'équipe de MOE doit comprendre un architecte mandataire, un bureau d'études technique, un bureau d'études thermique, un économiste et un spécialiste amiante. Montant prévisionnel des travaux : 5 800 000 euro(s) HT

Documents to submit

The usual items for this kind of tender; the tender documents have the exact list.
  • Team composition and CVsThe people proposed for each role, with CVs in the format asked.
  • Comparable project referencesUsually three to five, with client, value, dates and your role; often on the buyer's form.
  • Methodology and organisation noteHow the team will run the commission: phases, coordination, quality, BIM when asked.
  • Fee proposalOn the buyer's price schedule when there is one; by phase and discipline.
  • Turnover and financial standingAccounts or a bank statement when the tender sets a minimum turnover.
  • European Single Procurement Document: DUME or the DC1/DC2 formsOne per firm in the team, signed by its legal representative.
  • Company registration and proof of professional registrationCommercial register extract; architects' and engineers' registration certificates.
  • Professional indemnity insurance certificateFor each firm, with the cover the tender requires.
  • Team agreement or power of attorneyConsortium agreement, or the mandate naming the lead firm, when bidding as a group.

When you apply, this list becomes the workspace checklist: tick each document off and attach the file.

CPV codes

71221000