Implementation of Battery Energy Storage System at Čierny Váh
Slovenské elektrárne, a.s., Bratislava - mestská časť Ružinov · Slovakia
- Procedure
- Other service
- Nature
- Extension / refurb
- Building type
- Heritage
- Estimated value
- —
- Published
- 2026-11-04
- Deadline
- Not stated
Unlock this RFP
Members open the original notice and every tender document, read a plain-language brief and build their bid team in one workspace.
- The original notice and all the tender documents
- A plain-language brief in your language
- A workspace to build the team, collect the documents and submit on time
- Invite partner firms and guests: they never pay
Summary
CPV: Batérie The subject matter of the tender comprises EPC performance of all supplies and services related to design and engineering, permitting and other engineering activities, transportation, installation, commissioning and putting into operation of the newly installed equipment. The principal scope of supply is the construction and commissioning of a Battery Energy Storage System (BESS) providing the following functions and services: • Frequency Containment Reserve (FCR); • automatic Frequency Restoration Reserve (aFRR); • market services, including Day-Ahead and Intraday market participation, energy arbitrage and imbalance management; • Limited Frequency Sensitive Mode – Overfrequency (LFSM-O) and Underfrequency (LFSM-U), providing active power response in the event of an increase or decrease in grid frequency; and • island operation to ensure the auxiliary power supply of the pumped-storage hydropower plant in the event of a loss of the 22 kV power supply. The BESS shall have a total usable energy capacity of at least 480 MWh and a rated power of at least 120 MW and shall be connected to the 400 kV substation via a newly constructed 400 kV bay. The scope of works includes all engineering and permitting activities, preparation of design documentation, civil, electrical and mechanical works, delivery and installation of battery containers, power conversion systems, energy management systems, transformers, switchgear and associated equipment. The contractor shall also ensure integration with existing plant systems, implementation of control, protection, monitoring and communication systems, fire protection and security systems, testing, commissioning, performance verification and training of operating personnel. The tenderer shall provide all documentation, certifications, inspections and services necessary to ensure safe, reliable and long-term operation of the BESS installation.
Documents to submit
The usual items for this kind of tender; the tender documents have the exact list.- Team composition and CVsThe people proposed for each role, with CVs in the format asked.
- Comparable project referencesUsually three to five, with client, value, dates and your role; often on the buyer's form.
- Methodology and organisation noteHow the team will run the commission: phases, coordination, quality, BIM when asked.
- Fee proposalOn the buyer's price schedule when there is one; by phase and discipline.
- Turnover and financial standingAccounts or a bank statement when the tender sets a minimum turnover.
- European Single Procurement Document: ESPDOne per firm in the team, signed by its legal representative.
- Company registration and proof of professional registrationCommercial register extract; architects' and engineers' registration certificates.
- Professional indemnity insurance certificateFor each firm, with the cover the tender requires.
- Team agreement or power of attorneyConsortium agreement, or the mandate naming the lead firm, when bidding as a group.
When you apply, this list becomes the workspace checklist: tick each document off and attach the file.
CPV codes
31440000 · 71300000 · 31321300 · 31321210 · 45000000 · 31321000 · 45255400 · 71632000 · 80531200 · 31214000